Prerequisites
Ensure the same connection type is set
on the analyzer and in
Data Transfer. The Ethernet and Wireless
options may require additional setup to connect to the desired computer. See
the Ethernet and Wireless sections and your IT group for more information.
Note: You can connect multiple analyzers to AMS Machinery Manager at one
time. Each analyzer has a tab on the Data Transfer tab labeled with its ID or
name.
Procedure
-
Use the appropriate cable to connect your analyzer to a computer
where AMS Machinery Manager is installed, if you are using a wired connection.
-
On the computer, open
Data Transfer.
-
On the analyzer, press
.
The
Route Management screen displays.
Note: If you have not loaded or activated a route, the
Route Management screen opens when you press
F8 Route from the analyzer Home screen.
-
Press
F7 Connect For Transfer.
The analyzer connects to AMS Machinery Manager, and a new
tab with the analyzer
Device ID displays in the
Data Transfer tab.
-
To load a route using AMS Machinery Manager:
-
Select the appropriate database in the
Navigator - Data Transfer pane.
-
Drag and drop or copy and paste the desired route to the
connected analyzer in the
Data Transfer tab.
The
Data Transfer Notification pane displays the
progress of the transfer.
-
To load a route using the analyzer:
-
Press
F1 Set Storage Location to select internal
memory or a SD memory card to store the route.
-
Press
F7 Load Routes.
-
Press
F8 or
F9 to select a database.
-
Press
F10 or
F11 to select an area within the database.
-
Press
F4 Select Area.
-
Press
F8 or
F9 to select a route and press
F1 Select.
You can select multiple routes.
-
Press
F7 Load Route.
If the route is already in the analyzer, an error message
appears. Press
Enter to continue and overwrite the
existing route. You will lose any data stored in the existing route.
-
After the transfer completes, press the Back key to disconnect
from AMS Machinery Manager.