CSI 9420 Procedures
Content
Search
Useful? Want more? Tell us!
FAQ for this site
Advanced Diagnostics application
Attach the sensors
Conduit installation guidelines
Configure wireless network credentials in AMS Device Manager
Configuration with AMS Machinery Manager
Configuration overview
Connect the sensors
Connect to a wired HART interface
CSI 9420 Data Collection: Overview
CSI 9420 publishing policy
Enable the LCD
Epoxy mount (alternative)
Ground the transmitter
Install ferrites
Install the LCD
Maximum network size and publishing policy settings
Minimize power consumption
Mitigate interference
Power the CSI 9420
Reduce polarized interference
Remove the power module
Secure the sensor cables
Sensors
Sensor mounting/attachment tools and supplies
Set the wireless network configuration
Stud mount (preferred)
Trend parameters
Turn on the LCD
Verify status and operation
CSI 9420 Procedures
Content
Search
Keywords: